We've had some delays related to the installation of the double meter box. It's a pretty sight to see it finally installed. Initially, there was a manufacturing and delivery delay of the unit. Once the box arrived, however, it was defective, and had to be returned to the factory for repair. Given the trouble and added cost, I'd recommend finding an alternative solution for a basement unit--perhaps a sub meter or a splitting system that's separate from the meter.
No comments:
Post a Comment